|

|
This
high-end lobby renovation project with DIMEO Construction necessitated
pre-construction detail and budgeting reviews. It entailed closely
working with Jim Burnard of ColorCo Ltd. in preparation to have
all the polished granite tile water-jet cut to insure the architects
design in the final installation. This minimized on-site cutting
labor and made the off-hours install more efficient as the tile
was then laid out and installed "like a puzzle", resulting
in this visually striking entry that the architect and owner desired,
while keeping lobby and entry traffic patterns open to tenants and
customers. |

|
|